May 2008 Entries

Bitstop Thanks Emerson for Fast Response

Bitstop Inc thanks Mr John Villanueva (Supervisor) and Marlon Gawid (Service Engineer) of Emerson Electric for the fast response in servicing the 6KVA Liebert UPS. The Liebert UPS are supporting our data center in the wake of power outage that hit the province as a result of typhoon Cosme. Generators need to rest and the Liebert UPS are vital component of our power backup strategy. The immediate response from Emerson in providing technical assistance helped to ensure the continuous power supply to the datacenter.

Storm Causes Extensive Damage

Techcare Chief Mr Melvin Bueno reports that the storm hit Dagupan and left extensive damage. Electric posts were knocked down, causing extensive power outages. Our telecoms antenna was also knocked down so some of our circuits may not be working. We will know for sure come Monday. Extensive damage were reported in blown roofs from a lot of buildings. Other pictures are in the Gallery section under : “Storm Cosme Damage“  

Dagupan City Hall Call Center Inauguration

Bitstop Staff at Bangus Festival 2008

eRadioportal and Windows Live Tie-Up

As a direct result of Windows Live Training in Thailand from Microsoft, eRadioportal is now giving away free 5gb emails for @eradioportal.com courtesy of our tieup with Windows Live. Visit our eradioportal signup page or click on the icon above to avail of this offer!

Copyright © Bitstop Network Services, Inc

Design by Bartosz Brzezinski

Design by Phil Haack Based On A Design By Bartosz Brzezinski